Select your country:
   

Our Latest Project
Palace of the Golden Horses Selangor D.E., Malaysia

Strategically located in the Mines Resort City, Kuala Lumpur, The Palace of the Golden Horses used approx. Rm75,000-00 of Bute-PB for cold water plumbing for the 400 guest rooms and 80 suites.

The project took about 3 years from concept to physical completion...more details

 

View Other Projects
 
 
Australian Standard Certified Product Quality Endorsed Company Made in New Zealand
 
PGFDL
ARHT

BUTELINE INSTALLATION DEMONSTRATION

The Buteline Plumbing System is designed to be used with complete confidence. You will get a simple, controlled accurate joint every time.

Cut
Slightly twist pipe, as you begin to cut.
Use the Buteline PB pipe cutter to ensure a square clean cut....

Insert Pipe
Once you have cut the pipe, simply insert
into the Buteline fitting required to do the job.
Note: Make sure you fully insert pipe.

Clamp
Clamp the Buteline fitting, using ONLY the Buteline clamping tool.

  • Position the Buteline clamp tool squarely,
    approximately 2mm in from the end of the clamp ring.

  • Close handles to stops, hold in the tightly closed position for a
    moment, this ensures that the flow of material is performed.

  • Open and remove tool.

Completion
As you can see in the image, the process of using the Buteline System is
Quick, Simple and Highly Efficient.

Home | Buteline Plumbing System | Projects | Bute News | About Buteline | Contact
© 2000 - 2010 Picton Holdings Ltd. All rights reserved. Website design by Silicon Dream