About Buteline Home Contact Us  
 
Select your country:
   

golden horses
Pantai Medical Centre.
Bangsar

Pantai Medical Centre (PMC) has a history of 30 years serving the Malaysian public. Established in 1974, Pantai Medical Centre initially had 68 beds and 20 medical specialists. Buteline products were installed during the major refurbishment & extension works in late Nineties.more details
 

View Other Projects
 

BUTELINE PB INSTALLATION DEMONSTRATION

The Buteline Plumbing System is designed to be used with complete confidence. You will get a simple, controlled accurate joint every time.

Cut
Slightly twist pipe, as you begin to cut.
Use the Buteline PB pipe cutter to ensure a square clean cut...

Insert Pipe
Once you have cut the pipe, simply insert
into the Buteline fitting required to do the job.
Note: Make sure you fully insert pipe.

Clamp
Clamp the Buteline fitting, using ONLY the Buteline clamping tool.

  • Position the Buteline clamp tool squarely,
    approximately 2mm in from the end of the clamp ring.

  • Close handles to stops, hold in the tightly closed position for a
    moment, this ensures that the flow of material is performed.

  • Open and remove tool.

Completion
As you can see in the image, the process of using the Buteline System is
Quick, Simple and Highly Efficient.

Return to Previous Page

Home | Buteline Plumbing System | About Buteline | Contact
© 2000 - 2010 Picton Holdings Ltd. All rights reserved. Website design by Silicon Dream